Test the System

test tdm port-network 2

 

 

SPE B

 

 

TEST RESULTS

 

 

Port

Maintenance Name

Alt. Name Test No. Result

Error Code

PN 02A

TDM-BUS

294

PASS

 

PN 02A

TDM-BUS

296

PASS

 

PN 02A

TDM-BUS

297

ABORT

1005

PN 02B

TDM-BUS

294

PASS

 

PN 02B

TDM-BUS

296

ABORT

1005

PN 02B

TDM-BUS

297

PASS

 

Command successfully completed

Command:

Screen 8-15. Example Test Results for Time Division Multiplexing (TDM) Port Network 2

4.If Result is FAIL for any test, check the connectors of the Time Division Multiplexing (TDM) bus cables in Processor Port Network (PPN) 2.

5.Repeat these steps for each Expansion Port Network (EPN) to check the Time Division Multiplexing (TDM) bus cables.

Test Tone-Clock for each Expansion

Port Network (EPN)

Check each Tone-Clock for each Expansion Port Network (EPN) in the system.

1.Verify the screen displays: command:

2.Type test tone-clock 2A where 2A is the cabinet (see note on page 8-1)and carrier number for one of the Tone-Clocks installed, and press ENTER.

If any Result is FAIL, check the associated time division multiplexing bus cables and intercabinet cables in the Expansion Port Network.

3.Repeat Step 2 for each installed Tone-Clock board.

8-16Issue 1 September 1995

Page 126
Image 126
AT&T 555-230-894 manual Test Tone-Clock for each Expansion Port Network EPN