DEFINITY System Installation Roadmap

Administer the DEFINITY System According to

Customer Requirements

After the hardware is installed and the system is activated, the data for system and telephone features must be administered, using the provisioning plan created for this customer in Step 7 in Chapter 2, "Plan and Prepare the Site". All steps for the administration of the system are provided in the United Kingdom English book, DEFINITY Communications System Generic 3 Implementation, 555-230-655.

Test Telephones and Other Equipment

Complete this task by following the instructions provided in Chapter 10.

1.Make test calls (single-port-network switch).

2.Make test calls (two-port-network switch).

3.Make test calls (three-port-network switch).

4.Test the attendant console and selector console.

5.Test external ringing.

6.Test queue warning indicator.

7.Test integrated announcement.

8.Test music-on-hold.

9.Test emergency transfer.

10.Test remote access interface (known as INADS).

11.Test Basic Rate Interface (BRI).

Issue 1 September 1995 1-7