45

Installation and configuration

Purpose

This chapter describes how to prepare the system for installation, install the ICB into:

the IPE module for Meridian 1

the Option 11 shelf

the Media Gateway for CS 1000

the IPE module for CS 2100/Meridian SL-100

This chapter also describes how to connect the ICB to the administration terminal, and configure the card.

The chapter contains the following sections:

“Getting started” on page 45 – describes the steps to use when preparing for an installation.

“CS 1000 configuration” on page 47 – shows how to configure the Meridian 1 and CS 1000.

“CS 2100/Meridian SL-100 configuration” on page 55 – shows how to configure the Meridian SL-100.

“ICB installation and configuration procedures” on page 65 – shows how to install the card and set up the web server.

“ICB Installation Wizard” on page 72 – describes how to use the BUI’s Installation Wizard to complete configuration.

Getting started

To begin the installation, unpack and inspect the components, take inventory, and determine which IPE card slot(s) in which to install the ICB card(s). See Table 1 on page 24 for a complete listing of the ICB hardware.

Nortel Integrated Conference Bridge Service Implementation Guide

Page 45
Image 45
Nortel Networks 555-4001-135, 553-3001-358 manual Installation and configuration, Getting started