45
Installation and configuration
Purpose
This chapter describes how to prepare the system for installation, install the ICB into:
•the IPE module for Meridian 1
•the Option 11 shelf
•the Media Gateway for CS 1000
•the IPE module for CS 2100/Meridian
This chapter also describes how to connect the ICB to the administration terminal, and configure the card.
The chapter contains the following sections:
•“Getting started” on page 45 – describes the steps to use when preparing for an installation.
•“CS 1000 configuration” on page 47 – shows how to configure the Meridian 1 and CS 1000.
•“CS 2100/Meridian
•“ICB installation and configuration procedures” on page 65 – shows how to install the card and set up the web server.
•“ICB Installation Wizard” on page 72 – describes how to use the BUI’s Installation Wizard to complete configuration.
Getting started
To begin the installation, unpack and inspect the components, take inventory, and determine which IPE card slot(s) in which to install the ICB card(s). See Table 1 on page 24 for a complete listing of the ICB hardware.