46 Installation and configuration
Unpack and inspect the equipment
Unpack and inspect the equipment for damage. Follow the steps in Procedure 1, before performing the installation and configuration procedures in this chapter.
Procedure 1
Prepare for the installation
1Remove items from the installation site that can generate static charge.
2Use antistatic spray if the site is carpeted.
3Ground yourself before handling any equipment.
4Remove equipment carefully from its packaging. Save the packaging, in case the card has to be returned.
5Inspect the equipment for faults or damage. Report any damaged component to your Nortel Networks representative and the company who delivered the equipment.
This procedure is now complete
Take inventory
After unpacking and inspecting the equipment, verify that all necessary components are on site before beginning the installation. Check the equipment received against the shipping documents. Report any missing parts to your Nortel Networks representative.
Verify IPE Slot(s)
The ICB card can be installed in any IPE card slot associated with full
Table 4
ICB installation into card slots
Meridian system modules | ICB card slots |
|
|
NT8D37BA/EC IPE modules, and | All available IPE card slots. |
NT8D11BC/ED CE/PE modules. |
|
|
|
NT8D37AA/DC IPE modules. | IPE card slots 0, 4, 8, and 12. |
|
|
CS 1000. | 1, 2, or 3 of the Media Gateway, or slots |
| 7, 8, 9, or 10 of the Media Gateway |
| Expansion. |
|
|
Determine the access method
Select the access method,