4-6 Broadmore 1750 - Release 4.6
Chassis Installation and Grounding
Rack Mounting Procedure

Rack Mounting Procedure

Rack-mounting the Broadmore 1750 chassis requires:
two technicians
clear access to front and rear of rack
user-provided rack mounting hardware (screws)
DANGER! EXERCISE NORMAL PRECAUTIONS FOR LIFTING HEAVY
OBJECTS. USE TWO PEOPLE TO LIFT THE BROADMORE 1750. WHEN
LIFTING, SUPPORT IT FROM THE BOTTOM AND TAKE CARE TO AVOID
SHARP EDGES OR CORNERS.
WARNING! THE FRONT AND REAR COVERS OF THE CHASSIS MUST
REMAIN ATTACHED TO PREVENT THE CHASSIS FROM BENDING DURING
THE RACK-MOUNTING PROCEDURE.
Perform the following steps:
1. Ensure that the front and rear chassis covers are firmly attached to provide
mechanical support and prevent accidental damage.
2. Carefully lift the Broadmore 1750 and position it in the desired rack location.
One technician should support the rear and the second should support the front.
3. Ensure that there is a 1.75 inch space above the chassis for adequate air flow.
4. Insert screws through the chassis and rack mounting holes. Every bracket hole
must have a screw securely installed to ensure proper weight distribution and
support.