Man-Machine E1 maintenance interface software 311
The Pause command works the same for Display History as it does for
the other display commands. Simply enter DHPtosee a report on the
performance counters, one screen at a time.
Figure 75
Display History (D H) screen
As with all Display commands, the Pause command can be used to
display a full screen of the history report at a time, by entering DHP.
Clear Error
Reset the error counter to zero byenter ing the Clear Error(C E) command.
The error counter provides a convenient way to determine if the E1 link is
performing without errors since it can be cleared and examined at any time.
TestingThe Test Carrier (T) command allows tests to be run on the LEI, the
E1 link, or the CPE device. The three tests are designed to provide the
capability to isolate faulty conditions in any of these three sources. See
Table127 "MMI Tests" (page 312) for additional information on these three
test types. Enter the Tcommand, and at the prompt, enter which of these
three tests is to be initiated. The prompt is similar to Figure 76 "Test Carrier
(T) screen" (page 311).
Figure 76
Test Carrier (T) screen
Testscan be performed once, for one through 98 minutes, or continuously
(selected by entering 99 minutes), until a Stop Test command is entered.
Testscontinue for the duration specified even if a failure occurs, and
Nortel Communication Server 1000
Circuit Card Reference
NN43001-311 01.04 Standard
Release 5.0 23May 2008
Copyright© 2003-2008, Nor tel Networks
.