Operation 751
Figure 241
E and M TypeI signaling patterns - originating party release on a tandem connection
If answer supervision is provided by the farend, there is a change
from open to ground on the E lead (ground detection).
Outgoing calls are processed as follows:
The M lead changes from ground to battery.
If answer supervision is provided by the far-end,there is a change
from open to ground on the E lead (ground detection).