4-14
Performance Tests
5. Minimum R Channel Level
3Check the R sampler by substituting it with the B sampler (A6).
aMove cable W8 to the B sampler (A6), as shown in Figure4-7.
Figure4-7. Connections for Substituting the R Sampler (A4)
4Connect the equipment as shown in Figure 4-8.
Figure4-8. Setup for Checking the R Sampler (A4)