EQQH707E EQQH711E
EQQH707E THE ENTRY IS INVALID, ENTER A NUMBER IN THE RANGE 0 TO 999
Explanation: You have entered an invalid number in the field, it must be in the range 0 to 999.
System action: The request is rejected.
User response: Change the number to a valid value.
EQQH708E
H70801
TOGETHER WITH SPECIFIC
H70801
SELECTION(S) IS AMBIGUOUS
Explanation: Message variable
H70801
is DAY, WEEK or MONTH. You have selected either:
DAY together with specific days such as WORKDAY, MONDAY, FRIDAY
WEEK together with specific week numbers such as WEEK 26 and WEEK 34
MONTH together with specific months such APRIL, AUGUST and DECEMBER.
Such specifications are redundant and make the rule ambiguous.
System action: The request is rejected.
User response: Remove the redundancies to make the selection unambiguous.
EQQH709E RULE DEFINITION CANNOT BE MAPPED, THE RULE MUST BE REDEFINED
Explanation: The internal representation of a rule cannot be interpreted, and the corresponding rule command
cannot be derived from it. This is most likely caused by an internal OPC/ESA error.
System action: The rule command is not mapped and rule selections are not shown.
User response: Copy the AD temporarily to another AD identification. Then update the original AD by redefining the
erroneous rule so as to be able to continue using the original rule(s). Contact your local IBM Representative to
pursue the error analysis using the copied version.
EQQH710I NO DATES GENERATED FOR THE INTERVAL
IVLFROM
IVLTO
Explanation: GENDAYS is unable to generate dates for the rule and interval specified.
System action: No dates generated.
User response: Check the rule definitions and other factors that have an impact on date generation, such as
interval, calendar, user periods, and free day rule.
EQQH711E INTERVAL START
IVLFROM
IS LATER THAN INTERVAL END
IVLTO
Explanation: The start date of the generating interval is later than the end date.
The start date of the interval is the latest of these dates:
Run cycle in-effect date
AD valid-from date
1 January of the current year.
The end date of the interval is the earliest of these dates:
Run cycle out-of-effect date
AD valid-to date
31 December of the current year plus three years.
A maximum of 4 years can be displayed.
System action: The request is rejected.
User response: Check the dates, correct any inconsistency, and enter the GENDAYS command again.