EQQ0616W EQQ0820E
EQQ0616W RESOURCE
RESNAME
IS RETAINED IN CURRENT PLAN, EVEN THOUGH NO DEFINTION EXIST IN
TAB DATASET
Explanation: This message is issued by the DP batch programs to the Daily Planning report dataset, whenever a
resource is kept in the current plan (or NCP). The resource definition does no longer exist in the RD file, but
operations are still using this resource in not yet expired availability intervals.
System action: Daily Planning continues normally.
User response: Verify that the resource named here should be deleted. Use the TME 10 OPC MCP dialog to
modify the resource if needed.
EQQ0617I ********************************************************************
Explanation: This message is issued by the DP batch programs to the Daily Planning report dataset, when an
operation will miss deadline due to a special resource allocation delay. The message identifies the operation, the
special resource causing the delay, and the previous planned start time. The reason why the special resource
allocation cannot be satisfied is also included. The reason text can contain:

Special Resource is not available

. The special resource is not available at the time indicated by the planned start
time. Either an interval specifies that the resource should be unavailable or if no interval exists for this time, the
default values specify that the resource is not available.

The Workstation is not connected to this resource

. The workstation on which the operation is defined is not in the
workstation connect table at the planned start time.

Resource contention

. The resource could not be allocated because it was already allocated by another operation.
System action: Daily Planning continues normally.
User response: Use the reason to decide if you should change the special resource definition or the application
description.
|EQQ0618W RES:
RESNAME
DEFAULTS WERE RESET
|Explanation: This message is issued by the DP batch programs to the Daily Planning report dataset when the
|default segment of a special resource differs from what is defined in the special resource database.
|System action: Daily Planning continues normally. The default interval of the special resource is reset to the values
|specified in the special resource database.
|User response: If the default values have been changed in the special resource monitor log, update the values
|again or update the defaults set in the database.
EQQ0619W RESOURCE
RESNAME
DEFAULT WERE RESET
Explanation: This message is issued by the daily planning batch programs to the daily planning report dataset when
the default interval of a special resource differs from what is defined in the special resource database.
System action: Daily planning continues. The default interval of the special resource is reset to the values specified
in the special resource database.
User response: If the default values were changed using the special resources dialog, you might want to use the
dialog to reset the values to the defaults in the database, or you might update the values in the database.
EQQ0820E APPLICATION
NAME
, OPNUMBER

NO

DOES NOT EXIST
Explanation: The indicated application name/operation number, for which you want to create an operator instruction,
cannot be found in the application description database.
System action: The job is terminated.
User response: Check a printout of the applications in your installation.