EQQ0521E EQQ0528W
EQQ0521E SORT FAILURE FOR WORK DATA SET:
DDN
Explanation: Sort was invoked to sort on a long-term plan dataset but returned RC=16.
System action: The job is terminated.
User response: Make the SORT program diagnostic messages on SYSOUT available to your system programmer.
System programmer response: Investigate the reason for the incorrect sort and then rerun the job.
EQQ0522I MAXIMUM NUMBER OF LTP DEPENDENCIES PER OCCURRENCE IS
MAXDEP
Explanation: This message documents the maximum number of predecessors and successors that can be created
per occurrence using the maximum record sizes specified for the VSAM files defined by DD-statements EQQLDDS
and EQQLTDS.
System action: The LTP batch job continues processing.
User response: Verify that the maximum number of dependencies is not too small. If necessary, reallocate the
EQQLDDS and the EQQLTDS file to support a larger maximum record size and resubmit the LTP batch job.
EQQ0523W END DAY
DATE
ASSUMED WORKDAY FOR CORRECT LTP-CREATION
Explanation: The end date must be a workday when creating or extending the long-term plan.
System action:
DATE
is assumed as a workday and processing continues.
User response: Check the reason why
DATE
is a free day. If the long-term plan produced is incorrect, specify a
new end date to the nearest workday prior to this date, and then rerun the job.
EQQ0524W PERIOD
PNAM
IN APPLICATION
ADID
NOT FOUND
Explanation: The period specified in the application description database does not exist in the calendar database.
System action: The job continues processing but the job bypasses this run cycle and generates long-term plan
occurrences for the next run cycle.
User response: The period should be added to the calendar, or the application run cycle should be removed, or the
period name in the run cycle description should be changed.
EQQ0525W OFFSET > PERIOD LENGTH AD:
ADID
RUNCYCLE:
PNAM
SIGN
OFFS
Explanation: For a given application/run cycle number, the offset is greater than the period length for the period
specified.
System action: The job continues processing but no occurrences are created for the offset displayed.
User response: Correct either the offset or the period length in the calendar.
EQQ0527W
ADID
DATE
HAS OFFSET > NONCYCLIC PERIOD LENGTH
RUNCYCLE:
PNAM
SIGN
OFFS
- NOT PLANNED.
Explanation: The occurrence
ADID
DATE
has an offset that is greater than the length of closed interval of the
noncyclic period
PNAM
. (A closed interval has both origin and interval end dates defined.)
System action: The job continues processing but the occurrence is not planned.
User response: Correct either the offset specified, or the interval length of the noncyclic period.
EQQ0528W
ADID
DATE
MOVED OUTSIDE NONCYCLIC PERIOD INTERVAL
RUNCYCLE:
PNAM
SIGN
OFFS
FREE DAY RULE:
RULE
- NOT PLANNED
Explanation: The occurrence
ADID
DATE
has been moved by free day rule
RULE
. The moved date is outside the
closed interval of a noncyclic period. (A closed interval has both origin and interval end dates defined.)
System action: The job continues processing but the occurrence is not planned.
User response: Correct either the free day rule, or the interval length of the noncyclic period.
460 TME 10 OPC Messages and Codes