EQQ0328W EQQ0332W
EQQ0328W CURRENT PLAN REPORT OPTION MUST BE 0 OR 1 - SET TO 1
Explanation: The batch program has an incorrect SYSIN statement, most likely because the batch program was not
submitted using the dialog.
The current plan report options are:
0For current plan reports not required
1For current plan reports required.
System action: The value is set to 1 and the daily planning program continues processing.
User response: Change the parameter value for the current plan report option to 0 or 1 in the SYSIN statement for
the daily planning program.
EQQ0329E A NEW CURRENT PLAN ALREADY EXISTS
Explanation: A new current plan dataset, created by a previous daily planning run, is not yet processed by TME 10
OPC.
System action: The daily planning program is terminated.
User response: Start TME 10 OPC if it is not already started, and use the Daily Planning dialog to resubmit the job.
EQQ0330W PLANNED RESOURCE UTILIZATION REPORT OPTION MUST BE 0 OR 1 - SET TO 1
Explanation: The batch program has an incorrect SYSIN statement, most likely because the batch program was not
submitted using the dialog.
The planned resource utilization report options are:
0For planned resource utilization report not required
1For planned resource utilization report required
System action: The value is set to 1 and the daily planning program continues processing.
User response: Change the parameter value for the planned resource utilization report option to 0 or 1 in the SYSIN
statement for the daily planning program.
EQQ0331W ACTUAL RESOURCE UTILIZATION REPORT OPTION MUST BE 0 OR 1 - SET TO 1
Explanation: The batch program has an incorrect SYSIN statement, most likely because the batch program was not
submitted using the dialog.
The actual resource utilization report options are:
0For actual resource utilization report not required
1For actual resource utilization report required
System action: The value is set to 1 and the daily planning program continues processing.
User response: Change the parameter value for the actual resource utilization report option to 0 or 1 in the SYSIN
statement for the daily planning program.
EQQ0332W NO DEP IN **************** ******** **.**, **************** ******** **.**
Explanation: No external dependency has been found between operations in the occurrences

OCCURRENCE

and

OCCURRENCE

as defined in the application description database and in the default rules. This message is followed
by message EQQ0333W or EQQ0334W.
System action: The two occurrences specified are planned without dependencies.
User response: Use the application description dialog to verify and correct the dependency, and/or use the Modify
Current Plan dialog to add the dependency to the current plan.
446 TME 10 OPC Messages and Codes