Chapter 5 Cisco ASR 1004 Router Overview and Installation

Connecting Power to Cisco ASR 1004 Router

Step 3 On the DC power supply terminal block, locate the GND connection which must be connected first and follow these steps:

a.Using the two-hole grounding lug, replace the washers and Kepnut screw in the following order.

Flat washer

Grounding cable lug

Kepnut screw

b.Tighten the Kepnut screws (use the screwdriver to tighten the screw in the terminal block to a torque of 8 in-lbs / 2 per.) on the power supply studs.

Figure 5-19 Cisco ASR 1004 Router DC Power Supply Grounding Wire and Stud

End View

All measurements in inches

2.24

0.48

Ø0.267

2 holes

0.25 0.63 0.37 0.08

Crimp area

25527

Step 4 Attach the other end of the cable to the site ground connection.

Caution Before you continue to install the terminal block wires, stop and perform Step 5. To prevent any contact with metal lead on the wire and the plastic cover.

Step 5 You must wrap the positive and negative cables with sleeving. Take each wire and cover the area from the lug to the wire with heavy shrink sleeving.

 

 

Cisco ASR 1000 Series Aggregation Services Routers Hardware Installation and Initial Configuration Guide

 

 

 

 

 

 

OL-13208-03

 

 

5-27

 

 

 

 

 

Page 155
Image 155
Cisco Systems ASR 1000 Series manual OL-13208-03