Chapter 8 Replacing Cisco ASR 1000 Series Routers
Removing and Replacing a DC Power Supply in Cisco ASR 1004 Router
Figure 8-27 Cisco ASR 1004 Router DC Power Supply Terminal Block
1 2 3 4
4
280188
1 | DC power supply negative terminal | 3 | DC power supply earth ground terminal |
|
|
|
|
2 | DC power supply positive terminal | 4 | Terminal block plastic cover screws |
|
|
|
|
Caution Before you continue to install the terminal block ground wires, stop and perform Step 5 to prevent any contact with metal lead on the ground wire and the plastic cover.
Step 5 You must wrap the positive and negative cables with sleeving. Take each ground wire and cover the area from the lug to the wire with heavy shrink sleeving (see Figure
Step 6 Attach the GND wire first and follow this order:
a.Flat Washer
b.Ground lug with grounding wire
c.Kepnut screw
Step 7 Tighten the
Step 8 Insert the positive ground cable. Replace the ground lug with cable in the following order:
a.Flat Washer
b.Ground lug with positive wire
c.Kepnut screw
Step 9 Tighten the
| Cisco ASR 1000 Series Aggregation Services Routers Hardware Installation and Initial Configuration Guide |
|