Delta Electronics VFD-VL manual Maintenance and Inspections, One

Models: VFD-VL

1 251
Download 251 pages 18.69 Kb
Page 188
Image 188

Chapter 6 Fault Code Information and Maintenance

6.2 Maintenance and Inspections

Before the check-up, always turn off the AC input power and remove the cover. Wait at least 10 minutes after all display lamps have gone out, and then confirm that the capacitors have fully discharged by measuring the voltage between DC+ and DC-. The voltage between DC+ and DC- should be less than 25VDC.

„Ambient environment

 

 

 

Maintenance

 

Check Items

Methods and Criterion

 

Period

 

 

Daily

Half

One

 

 

 

 

 

 

Year

Year

 

 

 

 

 

 

 

Check the ambient temperature,

Visual inspection and measurement

 

 

 

 

humidity, vibration and see if

 

 

 

 

with equipment with standard

{

 

 

 

there are any dust, gas, oil or

 

 

 

specification

 

 

 

 

water drops

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

If there are any dangerous

Visual inspection

{

 

 

 

objects

 

 

 

 

 

 

 

„

Voltage

 

 

 

 

 

 

 

Maintenance

 

Check Items

Methods and Criterion

 

Period

 

 

Daily

Half

One

 

 

 

 

 

 

Year

Year

 

 

 

 

 

 

 

Check if the voltage of main

Measure with multimeter with standard

 

 

 

 

circuit and control circuit is

{

 

 

 

correct

specification

 

 

 

 

 

 

 

 

 

 

 

 

 

 

„

Keypad

 

 

 

 

 

 

 

Maintenance

 

Check Items

Methods and Criterion

 

Period

 

 

Daily

Half

One

 

 

 

 

 

 

Year

Year

 

 

 

 

 

 

 

Is the display clear for reading

Visual inspection

{

 

 

 

 

 

 

 

 

 

Any missing characters

Visual inspection

{

 

 

 

 

 

 

 

 

Revision Nov. 2008, VLE1, SW V1.03

6-11

Page 188
Image 188
Delta Electronics VFD-VL manual Maintenance and Inspections, One, Voltage Maintenance Check Items Methods and Criterion