OPERATION/CONTROL

3.1.2 Power on

Before switching power on, check the following:

Installation check

Make sure that the inverter is installed correctly in a proper location. (Refer to page 7.)

Wiring check

Make sure that the main and control circuits are wired correctly.

Make sure that the options and peripheral devices are selected and connected correctly. (Refer to page 9.)

Switch power on.

Power-on is complete when the POWER lamp is lit correctly and the operation panel (FR-DU04) displays correct data.

45

Page 57
Image 57
Mitsumi electronic FR-F520-0.75K, 55K instruction manual Power on, Before switching power on, check the following