3.4 Operation

OPERATION/CONTROL

3.4.1 Pre-operation checks

Before starting operation, check the following:

Safety

Perform test operation after making sure that safety is ensured if the machine should become out of control.

Machine

Make sure that the machine is free of damage.

Parameters

Set the parameter values to match the operating machine system environment.

Test operation

Perform test operation and make sure that the machine operates safely under light load at a low frequency. After that, start operation.