Unpacking

3.2 Unpacking and Preparing

Procedure

Table 3-1 Procedure for Unpacking and Preparing the UDA2182

Step

Action

ATTENTION

For prolonged storage or for shipment, the instrument should be kept in its shipping container.

Do not remove shipping clamps or covers. Store in a suitable environment only (see specifications in Section 2).

1Carefully remove the instrument from the shipping container.

2Compare the contents of the shipping container with the packing list.

Notify the carrier and Honeywell immediately if there is equipment damage or shortage.

Do not return goods without contacting Honeywell in advance.

3Remove any shipping ties or packing material. Follow the instructions on any attached tags, and then remove such tags.

4All UDA2182 Analyzers are calibrated and tested at the factory prior to shipment. Examine the model number on the nameplate to verify that the instrument has the correct optional features.

5Select an installation location that meets the specifications in Section 2. The UDA2182 can be panel- , wall-, or pipe-mounted (see Section 3.3).

ATTENTION

Pipe mounting is not recommended if the pipe is subject to severe vibration. Excessive vibration may affect system performance.

6

If extremely hot or cold objects are near the installation location, provide radiant heat shielding for the instrument.

3.3 Mounting

Introduction

The Analyzer can be mounted on either a vertical or tilted panel or can be pipe or wall mounted (option) using the mounting kit supplied. Overall dimensions and panel cutout requirements for mounting the analyzer are shown in Figure 3-1. Pipe mounting is shown in Figure 3-3. Wall Mounting is shown in Figure 3-4.

For Sample Tap Electrode Mounting recommendations, See Section 15.15 – page 229.

The analyzer’s mounting enclosure must be grounded according to CSA standard C22.2 No. 0.4 or Factory Mutual Class No. 3820 paragraph 6.1.5.

Before mounting the analyzer, refer to the nameplate on the outside of the case and make a note of the model number. It will help later when selecting the proper wiring configuration.

10

UDA2182 Universal Dual Analyzer Product Manual

January 2009

Page 22
Image 22
Honeywell manual Mounting, Procedure Procedure for Unpacking and Preparing the UDA2182, Step Action