Chapter 8 SXYX

7)

!CAUTION

Take care not to catch the harness or air tube with the cover when installing the covers.

Assemble the wiring box cover at the original position.

Wire lead-out port

Wire protection material

State with cover installed

Lay out the wires on

Pass the X-axis wiring

the protection material.

through this notch.

State of X-axis wiring box when wiring is completed

8-21

Page 139
Image 139
Yamaha 3-axis model, 4-axis model State with cover installed, State of X-axis wiring box when wiring is completed