11-18

Chapter 11 FXYBX/SXYBX
10) When completed with all wiring work, return each wiring box cover to theoriginal positions. Sandwich the X-axis wiring and air tube with the protec-tive material at the wire lead-out port of each wiring box.
!
CAUTION

Take care not to catch the wiring or air couplers when installing the covers.

Remove the upper cover
of the Y-axis wiring box
Set the harness and air tube
from the grommets on the
X-axis wiring box
X-axis wiring box end face resin cover
When leading out the wires
from the Y-axis wiring box,
use the grommets on the upper cover
Carry out wiring and piping
Remove the four M4 screws
Carry out wiring and piping
r
t
q
e
w
Fig. 11-18