
CHAPTER 7 FXYX
1 Installation | ||
Installation bolt types | ||
Installation bolt nominal length | ||
Tightening torque | ||
Installation methods | ||
2 Protective Connections | ||
Ground terminal | ||
Ground wire | ||
Wiring method | ||
3 | Installing the Tool | |||
| ||||
| ZS | |||
4 | User Wiring and User Piping | |||
| Cable carrier type | |||
|
| Example of wiring and piping methods using cable carrier | ||
|
| Cable carrier specifications | ||
|
| User I/O cable specifications | ||
5 | Periodic Inspections | |||
| Replenishing grease to the linear guide | |||
| Replenishing grease to the ball screw | |||
CHAPTER 8 SXYX
1 Installation | ||
Installation bolt types | ||
Installation bolt nominal length | ||
Tightening torque | ||
Installation methods | ||
2 Protective Connections | |||
Ground terminal | |||
Ground wire | |||
Wiring methods | |||
| Arm type with cable carrier | ||
| Arm type with whipover cable, moving arm type, pole type | ||
| XZ type | ||
3 Installing the Tool | ||
| ||
Moving arm type | ||
ZF |
| |
| (Arm type, moving arm type, | |
RF |
| |
| (Arm type, moving arm type, | |
ZS/ZRS (Arm type | ||