40CHAPTER 3: INTEGRATED FAST SETUP

Setup Procedure Table 6 lists the steps or sections of the Integrated Fast Setup.

Sections

Table 6 Integrated Fast Setup Procedure Sections

Setup Section

Description

 

 

 

1

Routing Mode

Set the Routing Mode (EIISP or PNNI) for the

 

 

CoreBuilder® 9000 ATM Enterprise Switch

2

Network Prefix

Set Network Prefix for the CoreBuilder 9000 ATM

 

 

Enterprise Switch

3

PNNI Parameters

Set PNNI parameters for the CoreBuilder 9000 ATM

 

 

Enterprise Switch

4

LE Parameters

Set LE parameters for the CoreBuilder 9000 ATM

 

 

Enterprise Switch

5

LECS Address

Set active LECS address for the CoreBuilder 9000 ATM

 

 

Enterprise Switch

6

UNI/NNI parameters

Set UNI/NNI port parameters for ports in the ATM

 

 

Interface Module

7

IP and Management

Set IP address of the switch, address of the NMS

 

Configuration

application, default gateway address, and subnet mask

8

Confirmation

Confirm setup operation

 

 

 

Entering Data The Integrated Fast Setup procedure runs sequentially through the relevant data for all of the sections, displaying a prompt for each data item and a default value. If you want to change the default, enter a different value in place of the default. If you want to accept the default, press Enter.

Navigation Aids Table 7 lists the shortcut characters that you can use to move between sections of the Integrated Fast Setup procedure:

Table 7 Integrated Fast Setup Procedure Navigation Aids

Type To Go

<Back to previous section

> To next section

>S

To section indicated by double underlined ID letter S in section title

\Back to beginning of setup

$

To end of setup

 

 

Integrated Fast Setup For step-by-step instructions, see the CoreBuilder 9000 ATM Switch Operation Fabric Module Getting Started Guide.

Page 40
Image 40
3Com 9000 manual Integrated Fast Setup Procedure Sections, Integrated Fast Setup Procedure Navigation Aids, Type To Go