38CHAPTER 2: STARTING UP

Installation

This section describes installing the ATM Switch Fabric Module.

Installation Before you install the ATM Switch Fabric Module, ensure that you have Prerequisites met all of the following prerequisite conditions:

1Complete the chassis unpacking and installation procedure as described in the Chassis Quick Installation Guides. You can install the chassis in a rack, on a shelf, or on a tabletop.

2Install the power supply as described in the Power Supply Installation Guides and install the power cable as described in the Enterprise Management Engine Quick Start Guide for the

CoreBuilder 9000 Enterprise Switch.

3Install the Enterprise Management Engine as described in the Enterprise Management Engine Quick Start Guide for the CoreBuilder 9000 Enterprise Switch.

4Install the ATM Switch Fabric Module as described in the CoreBuilder 9000 ATM Switch Fabric Module Getting Started Guide

5Read the CoreBuilder 9000 ATM Interface Module Getting Started Guide to make sure that you have all of the required components to get your system up and running and that you have completed all of the prerequisite work.

6To manage the ATM Interface Module and CoreBuilder 9000 ATM Enterprise Switch through the Simple Network Management Protocol (SNMP), you must install the 3Com Transcend® Enterprise Manager for UNIX or for Windows NT.

Installing the For complete details on how to install the daughter cards into the ATM Daughter Cards Interface Module, see the CoreBuilder 9000 ATM Interface Module

Getting Started Guide.

Installing the ATM For complete details on how to install the ATM Interface Module into the Interface Module into CoreBuilder 9000 chassis, see the CoreBuilder 9000 ATM Interface

the Chassis Module Getting Started Guide.

Page 38
Image 38
3Com manual Installation, CoreBuilder 9000 Enterprise Switch