Checkstand Preparation
Product Reference Guide 2-11

Checkstand Preparation

Reference Figure 2-5. When performing a first time installation into a
new checkstand, verify before cutting that room will be allowed for
cabling, the AC/DC Power Supply, and the Sensormatic® Controller Box.
When making the opening, take extra care to accurately cut to the correct
dimensions. Mounting may require installation of support(s), countertop
routing, or other such devices. Depending upon checkstand design, you
may wish to install an item diverter to direct items toward the scan win-
dow. See the instructions in this manual titled “Counter Cutout” for more
details concerning the location and preparation of the opening.
Figure 2-5. Installation Overview
Item Diverter
Cable Routing
Groove
Connector
Bulkhead
AC/DC Power
Supply
Sensormatic®
Controller Box
EAS Service
Connection
POS TerminalRemote DisplayAux. Port EAS Port
Power
Scale Host
0.00