Installation Overview

When power is applied to the unit, the normal indicator sequence is:

The scanner indicator (top-most, green LED) will be lit (dim) steadily.

The EAS indicator (bottom-most, tri-color LED) will flash ON/ OFF during power-up. Additionally, the 7-segment display will flash the number ‘9’. indicating the EAS system is being initialized.

If the Selftest detects a problem, the 7-segment display will display a number code. Refer to Chapter 4, Problem Isolation, for a descrip- tion of failure codes and problem isolation procedures.

Scale calibration may be necessary to obtain a zero reading on the display on rare occasions.

NOTE

4.The unit should be permitted to reach thermal equilibrium before proceeding to the next steps. (Reference the topic Warm-Up Time in Chapter 1.) When the unit is moved from a cooler temperature (such as a storage area) to a warmer environment (such as a check- stand location), a period of 60 minutes must be allowed to acclimate the unit to ambient conditions. Once installed and powered up, a “power-up” warm-up period of 15 minutes must be allowed before calibrating or performing weighing operations. These two warm- up periods may run concurrently.

5.Verify that the scanner or scanner/scale passes an operational test by observing the following:

Product Reference Guide

2-21

Page 49
Image 49
Datalogic Scanning 9500, 9504 manual Product Reference Guide