Preparing the Analyzer for Use

Agilent 35670A

To do the incoming inspection

 

Check that the correct fuses are installed in the fuse holders.

An 8 amp, 250 volt, normal blow fuse is required for ac operation. A 30 amp, 32 volt, normal blow fuse is required for dc operation. Both fuses are installed at the factory. For instructions on removing the fuses or fuse part numbers, see ‘’To change the fuses.’’

Using the supplied power cord, connect the analyzer to an appropriate receptacle.

The analyzer is shipped with a three-conductor power cord that grounds the analyzer when plugged into an appropriate receptacle. The type of power cable plug shipped with each analyzer depends on the country of destination.

Set the analyzer’s power switch to on.

Press the switch located on the analyzer’s lower left-hand corner. The switch is in the on ( l ) position when in the ‘’in’’ position. The analyzer requires about 20 seconds to complete its power-on routine.

Test the electrical performance of the analyzer using the operation verification or the performance tests in chapter 3, ‘’Verifying Specifications.’’

The operation verification tests verify the basic operating integrity of the analyzer; these tests take about 11 2 hours to complete and are a subset of the performance tests. The performance tests verify that the analyzer meets all the performance specifications; these tests take about 2 1 2 hours to complete.

2-6

Page 44
Image 44
Agilent Technologies 35670-90066 manual Set the analyzer’s power switch to on