
GuestWorks and DEFINITY ECS Release 9 | Issue 1 |
Technician Handbook for Hospitality Installations | November 2000 |
Translations and Testing |
|
168 | |
|
|
■TCP Port — Enter the TCP port number (5002 or
|
|
|
| + | ||
+ |
| Switch Link Administration |
| + | ||
|
|
|
| + | ||
Switch Link Type: LAN |
|
| Country: UNITED STATES | |||
Extension Length: 3 |
|
| Switch: DEFINITY OVERLAN | |||
Host Switch Number: 1 |
|
|
|
| ||
AUDIX Number: 1 |
|
|
|
| ||
|
|
|
|
| ||
Switch | IP Address/ | TCP | Switch | IP Address/ | TCP | |
Number | Host Name | Port | Number | Host Name | Port | |
1 | 192.168.1.10 | 5002 |
|
|
| |
|
|
|
|
| ||
|
|
|
|
| ||
|
|
|
|
| ||
|
|
|
|
| ||
|
|
|
|
| ||
|
|
|
|
| ||
|
|
|
|
| ||
|
|
|
|
| ||
|
|
|
|
| ||
|
|
|
| + |
Reboot the INTUITY System (R4.4 Only)
You must now reboot the INTUITY system. This is not required on an R5 system.
1.Use the Customer/Services Administration > System Management > System Control > Shutdown System command to shut down the INTUITY system.
2.When the system asks for a number of seconds to wait before shutdown, enter 0. Follow the shutdown instructions to bring the system back up.
3.After bringing the system up, start up the voice system and then continue with link testing.
NOTE:
If you change any INTUITY system IP addresses on an R4.4 system after doing this administration, you must reboot the system before the link will come up.