GuestWorks and DEFINITY ECS Release 9
Technician Handbook for Hospitality Installations
555-231-743 Issue 1
November 2000
Translations and Testing
177Switch-to-INTUITY Translations
X.25 Link (INTUITY)

Checking the Switch Link

Use the Customer/Services Administration > Diagnostics > Switch Interface
Diagnostics command to determine if the link is active. During initial installation ,
this screen should show that the link is busied out.
After pressing to change the function key labels, the following function keys
control the status of the link:
busies-out the link
releases the link from busy-out
performs diagnostics on the link.

Select a Switch Type (R4.4 only )

Use the Switch Interface Administration > Switch Selection command to
access the switch selection administration.
Country — Enter the country where this system is installed.
Switch — Enter Definity.
+------------------------------------------------------------------------------+
+ Diagnose Switch Link +
+------------------------------------------------------------------------------+
| STATUS SWITCH-LINK |
| |
| Type Baud State |
| DCIU 9600 Busied |
| |
| Link Level 2 is Down |
| |
| DCIU switches (In/Out of data transfer) |
| 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 |
| I |
+------------------------------------------------------------------------------+
F8
F2
F3
F4
+-------------------------------------------------+
+ Switch Selection +
+-------------------------------------------------+
||
||
||
| Country: UNITED STATES |
||
||
||
| Switch: Definity |
||
||
||
+-------------------------------------------------+