5.4 Wizards

Edit Properties step for single networks/VLAN networks

Figure 38: Edit Uplink Set wizard (first step)

You can modify following parameters in the first step of the wizard:

Activate Port Backup

Switch to a backup port if an error occurs in the active port. The port backup function is only available if at least one backup port is con- figured.

Linkdown propagation

Send a linkdown event if both the active ports and the backup ports fail. The linkdown event triggers a failover process on the server blade if con- figured accordingly.

If you select Linkdown propagation, the ports of the related server blades receive a linkdown event if a problem occurs. If the LAN drivers in the operating system of the server blade are configured accordingly, this linkdown event then triggers a failover on the second LAN port. A

ServerView Virtual-IO Manager

177

Page 177
Image 177
Fujitsu V3.1 manual Edit Uplink Set wizard first step