Assess WAN link resources 125
Enough capacity
For each link, Table23 "Computation of link capacity as compared to ITG
load" (page 125) compares the available link capacity to the additional IP
Trunk3.01 (and later) load. For example, on link R4-R5, there is plenty
of availablecapacity (492 kbit/s) to accommodate the additional 24 kbit/s
of IP Trunk3.01 (and later) traffic.
Tabl e 23
Computation of link capacity as compared to ITG load
Link Utilization (%)
Incremental
IP Trunk 3.01 (and
later) load
End-
points Capacity
(kbit/s) Thresh
old Use
d
Available
capacity
(kbit/s) Site pair Traffic
(kbit/s)
Sufficient
capacity?
R1-R2 1536 80 75 76.8 Santa
Clara/Ottawa
+
Ottawa/Toky
o
21.2 Yes
R1-R4 1536 80 50 460.8 Santa
Clara/Tokyo
+ Santa
Clara/
Richardson
+
Ottawa /
Tokyo
31.4 Yes
R4-R5 1536 80 48 492 Santa
Clara/Richard
son
+ Ottawa/
Tokyo +
Santa
Clara/Tokyo
31.4 Yes
Some network management systems have network planning modules
that compute network flows in the manner just described. These modules
provide more detailed and accurate analysis, as they can take into account
actual node, link, and routing information. They also help assess network
resilience by conducting link and node failure analysis. By simulating
failures and re-loading network and re-computed routes, the modules
indicate where the network might be out of capacity during failures.