Cabling for the Media Card 32-port trunk card 215
Figure 47
Large system DCHIP cabling setup: inter-column
When the Universal Equipment Modules (UEM) are stacked vertically, or
the UEM columns are bolted together, they are cabled in an inter-column
configuration. See Figure 47 "Large system DCHIP cabling setup:
inter-column" (page 215). This applies when the UEM system columns
are physically separated and the DCHIP must exit the systems through
the I/O panel.
DCHIP Cable RoutingMeridian 1 Option 11C Cabinet/CS 1000M Cabinet
The following cables are specific to Meridian 1 Option 11C Cabinet/CS
1000M Cabinets. Cable connection details are shown in Figure 48 "Option
11C DCHIP system cabling" (page 216).
Nortel Communication Server 1000
IP TrunkFundamentals
NN43001-563 02.01 Standard
Release 5.5 21December 2007
Copyright© 2007, Nor tel Networks
.