Class 8839 58M Enclosed AC Drives
Specifications
183
09/2003 © 2000–2003 Schneider Electric All Rights Reserved
PART 3 EXECUTION
3.01 INSPECTION
a. Verify that the location is ready to receive work
and the dimensions are as indicated.
a. Do not install AC Drive equipment until the
building environment can be maintained within
the service conditions required by the
manufacturer.
3.02 PROTECTION
a. Before and during the installation, the AC
Drive equipment shall be protected from site
contaminants and debris.
3.03 INSTALLATION
a. Installation shall comply with manufacturer's
instructions, drawings and recommendations.
b. The AC Drive manufacturer shall provide a
factory certified technical representative to
supervise the contractor's installation, testing
and start-up of the AC Drive(s) furnished
under this specification for a maximum total of
[1,2,3] days. The start-up service sha ll be
quoted as a separate line item.
3.04 TRAINING
a. An on-site training course of [1,2] training days
shall be provided by a representative of the AC
Drive manufacturer plant and/or maintenance
personnel and quoted as a separate line item.
END OF SECTION