Class 8839 Econoflex™ AC Drives
Sample Specifications
210 09/2003
© 2000–2003 Schneider Electric All Rights Reserved
F. The combination enclosure shall include a 120 Vac smoke purge relay option [if required]. A user-
supplied 120 Vac signal shall be sequenced in a ccorda nce wit h lo cal fi re protec tion c odes a nd wi ll
switch the AC drive to 60 Hz operation for maximum fan motor speed. If drive bypass is supplied,
the smoke purge relay will isolate the AC Drive and run the fan mo tor full speed on bypass.
G. The combination enclosu re sh all inc lu de te rminal poi nt c onn ec tion for fire /freeze stat interlock, to
prevent drive [or bypass] operation.
2.12 Drive Isolation & Bypass Contactors
A. The AC Drive shall include mechanically and electrically interlocked isolation and bypass
contactors complete with Class 20 thermal overload relay , circuit break er disconnect, co ntrol circuit
transformer, AFC/OFF/BYPASS switch and TEST/NORMAL selector switch.
B. The operator shall have full control of the bypass starter by operation of the AFC/OFF/BYPASS
selector switch.
C. In the AUTOMATIC mode of operation the bypass contactors shall be sequenced by the 110-volt
rated auto start contact provided by the user.
D. The isolation contactor for the b ypass s hall be se que nced to pro vide m otor i solat ion du ring a driv e
ready state of operation.
E. A TEST/NORMAL selector switch shall provide test operation of the power converter while
operating the motor in bypass.
2.13 Harmonic Mitigation
A. The electrical distribution system has been designed to meet IEEE-519-1992 with the addition of
line reactors. These line reactors shall be mounted inside the drive enclosure.
PART 3: EXECUTION
The Enclosed AC Drive shall be Econoflexby Square D Company, Class 8839.
3.01 Inspection
A. Verify that the location is ready to receive work and the dimensions are as indicated.
3.02 Protection
A. Before and during the installation, the AC Drive equipment shall be protected from site
contaminants.
3.03 Installation
A. Installation shall be in compliance with manufacturer's instructions, drawings and
recommendations.
B. The AC Drive manufacturer shall pro v ide a factory certified technical representative to inspect the
contractor's installation, test and start-up the AC Drive(s) furnished under this specification for a
maximum total of [ ] days. The start-up service shall be quoted as a separate line item.
3.04 Training
A. An on-site training course of [ ] training days shall be provided by a representative of the AC
Drive manufacturer to plant and/or maintenance personnel.
3.05 Documentation
A. The AC Drive manufacturer shall sup ply a comprehens ive 8-1/2" x 1 1" bound instruction/i nstallation
manual that includes wiring diagrams, layo ut dia gra ms , and ou tline dimen sions . T his man ual mus t
be 3-hole punched for insertion in a shop manual supplied by the installing contractor.