Altivar® 58 TRX AC Drives
Suggested Specifications
© 2000–2003 Schneider Electric All Rights Reserved
142 09/2003
PART 3: EXECUTION
3.01 Inspection
a. Verify that the location is ready to receive work and the dimensions are as indicated.
b. Verify that power is available to the AC drives prior to installation.
3.02 Protection
a. Before and during the installation, the AC drive equipment shall be protected from site contaminants.
3.03 Installation
a. Installation shall be in compliance with manufacturer’s instructions, drawings a nd recomm endations .
b. The AC drive manufacturer shall provide a factory-certified technical representative to supervise the
contractor's installation, testing, and start-up of the AC drive(s) furnished under this specification for
a maximum total of [ ] days. The start-up service shall be quoted as a separate line item.
3.04 Training
a. An on-site training course of [ ] training days shall be provided by a representative of the AC drive
manufacturer and quoted as a separate line item.