Testing Type 5 Simplex Tie lines

25 Readminister port 1 for Type 1 Compatible.

26 Print out the tie line translation and make sure that all the ports are configured for Type 1 Compatible.

>If the tie lines are translated correctly according to Form 1b, testing is complete.

>If the tie lines are not translated correctly, repeat steps 4 through 6.

To test tie lines configured for Type 5 Simplex, follow these steps:

1Connect an attendant console to station port 10.

2Connect a printer to the SMDR port on the Processor Module. Set the printer port to 1200 baud.

3Set the Tie Line Module switches to E&M signaling/protected or unprotected mode. Refer to “Administering Tie Lines” on page 3-50 for instructions.

4Administer tie line port 1, and any ports being tested

(ports 2,3, or 4), to Type 5 Simplex. Refer to “Selecting the Signal Type” on page 3-56 for instructions. Administer all signaling parameters as specified by Form 1b, System Form- Tie Lines.

5Assign the tie lines to two stations, called station A

and station B in this procedure, in order to conduct the tests. Assign the tie lines to a line pool (890 through

899).

Tie Line Troubleshooting 4-23

Page 354
Image 354
AT&T 518-600-016 Readminister port 1 for Type 1 Compatible, Assign the tie lines to two stations, called station a, 899