Preinstallation Requirements

REVIEWING THE

Review the completed system planning forms, which

PLANNING FORMS

should be on site, before starting installation. The forms

 

for Release 3 are titled:

 

Form la, System Form—Incoming Lines

 

Form 1b, System Form—Tie Lines

 

Form 1c, System Form—Module Identification

 

Diagram

 

Form 1d, System Form—Station Planning

 

Form 1e, System Form—Requirements and Options

 

The forms for Feature Modules 1 and 2 are titled:

 

Master Planning Form

 

System Configuration Form

 

You should be familiar with the entire layout of the system

 

including wiring, jack field, network interface, and

 

accessory requirements. If the system has data hardware,

 

see the separate manual, MERLIN II Communications

 

System Data Communications Guide, for complete

 

instructions for installing data equipment.

ENVIRONMENTAL

The control unit should be operated in an environment that

REQUIREMENTS

meets the following conditions.

 

Operating temperatures. The operating temperature

 

should be 40 to 1040F (4 to 400C). Optimum

 

operating temperature is 600F.

 

Humidity. The humidity should be between 20 and 80

 

percent.

 

Airborne contamination. Do not expose the control

 

unit to moisture, corrosive gas, dust, chemicals, spray

 

paint, or similar material.