Preinstallation Requirements
REVIEWING THE | Review the completed system planning forms, which |
PLANNING FORMS | should be on site, before starting installation. The forms |
| for Release 3 are titled: |
| ● Form la, System |
| ● Form 1b, System |
| ● Form 1c, System |
| Diagram |
| ● Form 1d, System |
| ● Form 1e, System |
| The forms for Feature Modules 1 and 2 are titled: |
| ● Master Planning Form |
| ● System Configuration Form |
| You should be familiar with the entire layout of the system |
| including wiring, jack field, network interface, and |
| accessory requirements. If the system has data hardware, |
| see the separate manual, MERLIN II Communications |
| System Data Communications Guide, for complete |
| instructions for installing data equipment. |
ENVIRONMENTAL | The control unit should be operated in an environment that |
REQUIREMENTS | meets the following conditions. |
| ● Operating temperatures. The operating temperature |
| should be 40 to 1040F (4 to 400C). Optimum |
| operating temperature is 600F. |
| ● Humidity. The humidity should be between 20 and 80 |
| percent. |
| ● Airborne contamination. Do not expose the control |
| unit to moisture, corrosive gas, dust, chemicals, spray |
| paint, or similar material. |
Preinstallation Requirements