Monitor Maintenance

 

 

 

 

 

 

Procedure

Frequency

Source of Information

 

 

 

 

 

 

 

Preventative Maintenance

2.5 years of continuous use

See “Testing and

 

 

Replace backlight tube

or as needed

Maintaining the CMS” in the

 

 

assembly

Perform the Preventive

“CMS Service Guide” or

 

 

Cleaning procedures

Maintenance Procedure for

“Testing and Maintaining

 

 

 

the M1180A #A01/A02 Wall

the V24 and V26“in the “V24

 

 

 

Mount Assembly every year.

and V26 Service Guide”.

 

 

 

 

 

 

 

Full performance checks

At least every two years,

See “Testing and

 

 

including safety checks.

after any repairs, or as

Maintaining the CMS” in the

 

 

 

needed.

“CMS Service Guide” or

 

 

 

 

“Testing and Maintaining

 

 

 

 

the V24 and V26“in the “V24

 

 

 

 

and V26 Service Guide”.

 

 

 

 

 

 

 

 

 

 

 

 

Check Calibration of NBP &

Once a year

See chapter 3 of the CMS

 

 

Sidestream CO2

 

Service Guide “Maintaining

 

Maintenance

Sidestream CO2

 

the CMS”.

 

 

 

the CMS”.

 

 

Check Calibration of all

Every 2 years

See chapter 3 of the CMS

 

 

parameters except NBP &

 

Service Guide “Maintaining

 

 

 

 

 

 

 

 

 

 

 

 

Maintenance 13-7

Page 373
Image 373
Philips V24CT, V26CT manual Procedure Frequency Source of Information