Chapter 4 Equipment List

Module/Installation Hardware

This table shows the names and functions of the modules.

Equipment Name

Function Name

Remarks

 

 

 

SN1729 PIMMJ

PIM

Port Interface Module (PIM)

 

 

Maximum 64 physical ports per PIM. Houses two batteries for

 

 

protection from short power interruption (for 30 minutes).

 

 

At maximum configuration, the system consists of eight PIM’s,

 

 

and provides a total of 512 physical ports (64 ports × 8).

 

 

 

SN1730 PIMMK

PIM

Port Interface Module (PIM) for Backup CPU System

 

 

Maximum 64 physical ports per PIM.

 

 

Houses two batteries for protection from short power

 

 

interruption (for 30 minutes).

 

 

One PIM is required per Backup CPU System.

 

 

 

COVER PARTS

COVER PARTS

Cover Parts Assembly

ASSEM-A

ASSEM

One cover parts assembly is required for each PIM.

 

 

 

SN1545

BASE/TOP

Base/Top Cover Assembly

BASE

ASSEM

One base and top cover assembly is required for each stack.

 

 

 

SN1731

BATTM

Battery Module for housing PIM or CS (ZT) backup batteries

BATTMH

 

Houses two pairs of batteries for protection from long power

 

 

interruption (for 3 hours).

 

 

 

UNIVERGE NEAX 2000 IPS Request For Proposal (RFP) Reference Guide

Page 4-1

Issue 6

 

Page 73
Image 73
NEC 2000 IPS manual Equipment List, Module/Installation Hardware, Equipment Name Function Name