UNIVERGE NEAX 2000 IPS Request For Proposal (RFP) Reference Guide Page 4-1
Issue 6
Chapter 4 Equipment List

Module/Installation Hardware

This table shows the names and functions of the modules.
Equipment Name Function Name Remarks
SN1729 PIMMJ
PIM Port Interface Module (PIM)
Maximum 64 physical ports per PIM. Houses two batteries for
protection from short power interruption (for 30 minutes).
At maximum configuration, the system consists of eight PIM’s,
and provides a total of 512 physical ports (64 ports × 8).
SN1730 PIMMK
PIM Port Interface Module (PIM) for Backup CPU System
Maximum 64 physical ports per PIM.
Houses two batteries for protection from short power
interruption (for 30 minutes).
One PIM is required per Backup CPU System.
COVER PARTS
ASSEM-A
COVER PARTS
ASSEM
Cover Parts Assembly
One cover parts assembly is required for each PIM.
SN1545
BASE
BASE/TOP
ASSEM
Base/Top Cover Assembly
One base and top cover assembly is required for each stack.
SN1731
BATTMH
BATTM Battery Module for housing PIM or CS (ZT) backup batteries
Houses two pairs of batteries for protection from long power
interruption (for 3 hours).