The TROY XCD print server will go through the following startup sequence:
1.It will run through a set of
2.When the test LED goes out, the other LEDs on the print server will come on as follows:
•On the XConnect II and XConnect II Lite, the LINK LED will blink to show activity on the network. The XMIT and RCV LEDs will come on solid if there is a valid 10baseT connection (they are not used with 10base2).
•On the XConnect 100, the Link OK LED will blink if the print server detects activity on the network. The 100baseTX LED will come on if a valid 100baseTX connection is detected (this LED will not come on if 10baseT is used).
•On the Pony 100, the Link LED will come on solid if there is a valid 10baseT or 100baseTX connection.
•On the Pony Print Server Plus, the LED will blink randomly.
If the LEDs do not come on as described, there may be a cabling problem or a bad hub port; if this is the case, try a different cable and/or hub port.