CAUTION ! CAUTION

Do not reset starter loads or any other starter safety for 30 seconds after the compressor has stopped. Voltage output to the compressor start signal is main- tained for 10 seconds to determine starter fault.

Before Initial Start-Up

Job Data Required

•list of applicable design temperatures and pressures (product data submittal)

•machine certified prints

•starting equipment details and wiring diagrams

•diagrams and instructions for special controls or options

•19XL Installation Instructions

•pumpout unit instructions

Equipment Required

•mechanic’s tools (refrigeration)

•digital volt-ohmmeter (DVM)

•clamp-on ammeter

•electronic leak detector

Page 125
Image 125
Carrier PC211 specifications Before Initial Start-Up, Job Data Required