Service Operat ion
To view the menu-driven pr og rams available for S er v ic e Operation, see Service Operation
section. For examples of LID display screens, see Table 2 (begins on this page).
Table 2 — LID Screens
Note:
1. Only 12 lines of information appear on the LID screen at any given time. Press NEXT or
PREVIOUS to h ighlight a poin t or to view points below or above the current scr een.
2. The LID may be configur ed in English or SI units, as required, through the LID conf iguration
screen.
3. Data appearing in the Re ference Point Name s co lum n is used for CCN operatio ns on ly.
4. All options ass ociated with ICE BUILD, Lead/Lag, CCN Occupancy Configuration, a nd Soft
Stopping are only available on PSIO Soft ware Version 9 and higher.
Click on an e xample to vie w:
Example 1 — Status01 Display Screen
Example 2 — Status02 Display Screen
Example 3 — Status03 Display Screen
Example 4 — Setpoint Dis play Screen
Example 5 — C onfiguration (Config) Di splay Screen