Table 3 — Protective Safety Limits and Control Settings (Continued)

Monitored Parameter

Limit

Applicable Comments

 

 

 

Starter Acceleration Time

>45 seconds

For machines with reduced voltage

(Determined by inrush current

 

mechanical and solid-state starters

going below 100% compres-

 

 

>10 seconds

For machines with full voltage starters

sor motor load)

 

(Configured on Service1 table)

 

 

 

 

 

Starter Transition

>75 seconds

Reduced voltage starters only

 

 

 

 

Energizes condenser pump relay if

CONDENSER FREEZE POINT config-

 

condenser refrigerant temperature or

ured in Service01 table with a default

 

condenser entering water tempera-

setting of 34 F (1 C).

Condenser Freeze Protection

ture is below the configured con-

 

denser freeze point temperature.

 

 

 

 

Deenergizes when the temperature is

 

 

5 F (3 C) above condenser freeze

 

 

point temperature.

 

 

 

 

Flow Switches (Field Supplied)

Operate water pumps with machine off. Manually reduce water flow and observe switch for proper cutout.

Safety shutdown occurs when cutout time exceeds 3 seconds.