Carrier PC211 specifications

Models: PC211

1 392
Download 392 pages 38.23 Kb
Page 187
Image 187

 

e.

Open valve 5 fully after the pressure rises above the freeze point of the refrigerant. Open

 

 

liquid line valve 7 until refrigerant pressure equalizes.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Valve

1a

1b

2

 

3

 

4

5

6

7

8

11

12

13

14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Condition

 

 

C

 

 

 

C

 

 

 

C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. Transfer remaining refrigerant.

 

 

 

 

 

 

 

 

 

 

 

 

 

a.

Close valve 5 and open valve 4.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Valve

1a

1b

2

 

3

 

4

5

6

7

8

11

12

13

14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Condition

 

 

C

 

 

 

 

C

 

 

C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

b. Turn off the water pumps through the LID.

 

 

 

 

 

 

 

 

 

c.

Turn off the pumpout condenser water, and turn on the pumpout compressor to push

 

 

liquid out of the storage tank.

 

 

 

 

 

 

 

 

 

 

 

 

 

d. Close liquid line valve 7.

 

 

 

 

 

 

 

 

 

 

 

 

 

e.

Turn off the pumpout compressor.

 

 

 

 

 

 

 

 

 

 

 

f.

Close valves 3 and 4.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 187
Image 187
Carrier PC211 specifications