MERLIN LEGENDCommunications System Release 6.1 | Issue 1 |
System Planning | August 1998 |
D T1/PRI Planner | Page |
| |
|
|
9.To ensure that the synchronization integrity of the DS1 network both this communications system and its
100D module:
a.Fill in the control unit slot number(s) of the 100D modules connected to the CSU(s).
b.Write the approximate number of cable feet between each module and its CSU or
c.For the model number(s) of the CSU(s), do one of the following:
■If the CSU is the ACCULINK 3150, check the box for the ACCULINK 3150.
■If the CSU is not the ACCULINK 3150, check the Other box and write the manufacturer’s name and model number in the space provided at the bottom of the page.
■If no CSU is needed, check None.
d.In the connection block(s), describe the DS1’s
■If connected to the telephone company central office, check CO.
■If connected to another communications system, check PBX.
■If connected to the PRI network, check PRI.
■If the facility’s type of service is T1, check the type(s) of emulated trunks. Also, check the Services box if the facility includes services such as MultiQuest with DNIS.
e.Describe the clock synchronization sources according to the key at the lower left of the map.
i.Draw a circle and line from the clock source to the appropriate 100D module.
ii.Label the circle P for primary, S for secondary, or T for tertiary.
10.Make a copy of the T1/PRI Planner for your records and forward the original to SDSC.
As an example, the system described in Figure