RACK MOUNTING

INSTALLATION

The required parts and tools are listed below:

Quantity

Description

Anritsu Part

Max. Torque

(each)

Number

Setting

 

 

 

 

 

2

HANDLE, PULL, CHASSIS, PLASTIC, HARDWARE

783-1055

 

 

 

 

 

4

SPEED NUT

790-319

 

 

 

 

 

8

6-32, SST, WASHER, FLAT

900-345

 

 

 

 

 

4

M4, 8.00 MM, PHH, SCREW, FLAT HEAD

900-795

 

 

 

 

 

4

DECORATIVE SCREW

900-821

 

 

 

 

 

8

M3X8, POS, SST, PATCHLOCK, SCREW, METRIC,

905-68

.4lbf.in

 

PAN HEAD

 

[45cN m]

 

 

 

 

 

 

 

6

M3X5, POS, SST, PATCHLOCK, SCREW, METRIC,

905-72

.4lbf.in

 

PAN HEAD

 

[45cN m]

 

 

 

 

 

 

 

6

SNAP RIVET, PLASTIC

788-575

 

 

 

 

 

1

RACK MOUNT, SIDE, BRACKET

C37276

 

 

 

 

 

1

REAR SUPPORT, BRACKET, RACK MOUNT

C41449

 

 

 

 

 

1

RACK MOUNT, SUPPORT, BRACKET

D41473

 

 

 

 

 

1

BRACKET SUPPORT, BASE PANEL

49361

 

 

 

 

 

1

FRONT FACE PLATE

49362

 

 

 

 

 

1

POWER METER FITTED WITH RACK MOUNT TOP

ML2430A

 

 

AND BOTTOM COVERS

 

 

 

 

 

 

Table 2-1ML2430A-01 Rack Mount Kit Parts List

Tools Required: Small Phillips screw driver

Large Phillips screw driver

Small Phillips torque screw driver 10cNm to 120cNm

Assembly drawing “ML2400A/01 RACK MOUNTED LEFT

OR RIGHT OPTION”

Assembly Procedure 1. Confirm the correct tools are available and the parts listed above are present. Re- fer to diagram on page 2-5 throughout this procedure.

2.Fit the two handles 783-1055 to front plate 49362 and the front rack bracket C37376 using 4 screws 900-795.

3.Lay the large support bracket D41473 next to the Power Meter as per the assem- bly drawing. Note if the PM needs to be mounted on the left hand side of the rack, simply lay the bracket on the PM’s right side. i.e. a mirror image of the assembly drawing.

4.

2-4

ML2430A OM

 

 

Page 16
Image 16
Anritsu ML2430A operation manual Rack Mounting, Or Right Option