Anritsu ML2430A operation manual Installation, Environmental Requirements, Rack Mounting

Models: ML2430A

1 271
Download 271 pages 6.82 Kb
Page 15
Image 15

INSTALLATION

ENVIRONMENTAL REQUIREMENTS

Fuses

The ML2430A Series Power Meter AC and DC input

 

lines are protected by internally mounted fuses. These

 

fuses should only be changed by qualified service per-

 

sonnel. Replace only with fuses of the same type and

 

rating (AC fuse is 2A, 250V, slow-blow; DC fuse is 3A,

 

125V, slow-blow).

Grounding

The ML2430A Series Power Meter must be properly

 

grounded. Failure to ground the instrument could be

 

hazardous to operating personnel. The meter is sup-

 

plied with a three-conductor power cord. The instru-

 

ment is properly grounded during AC line operation

 

when the plug is connected to a properly installed

 

three-prong receptacle. A grounding terminal is pro-

 

vided on the rear panel to ground the unit during op-

 

eration from a DC supply.

2-5

2-6

ENVIRONMENTAL

The ML2430A Series Power Meter is designed to operate within the tem-

REQUIREMENTS

perature range of 0 to 50° C (32 to 122° F) with a maximum humidity of

 

90% at 40° C (104° F), non-condensing. Full accuracy is specified at 5 to

 

35° C (23 to 95° F).

 

Although not recommended, operation in temperatures to –20° C

 

(–4° F) is possible. At these temperatures, however, the liquid crystal dis-

 

play may exhibit excessively slow response. The soft sided carry case

 

(part number D41310) and optional front panel cover (option ML2400A-

 

12) can be used to help retain internally generated heat and may improve

 

response.

RACK MOUNTING

The ML2430A Series Power Meter can be ordered with rack mounting

 

hardware that allows the unit to be mounted into a standard 19-inch

 

equipment rack. There are two rack mount option kits available:

 

￿ The ML2400A-01 Rack Mount option allows the installation of a sin-

 

gle ML2430A in either the left or right side rack position.

 

￿ The ML2400A-03 Rack Mount option allows side-by-side mounting

 

of two ML2430A Power Meters.

 

The Power Meter itself must be ordered from the factory as a rack

 

mount-ready unit. As such, it will be fitted with rack mount top and bottom

 

cases. These cases have extra mounting holes so that the rack mount kits

 

can be installed. Instructions for installing the rack mount kits follow.

ML2400A-01 Rack

This section describes the assembly procedure for fitting a single ML2430A

Mount Installation

Power Meter (PM) unit into an instrument rack. The PM must be fitted with rack

 

mount top and bottom covers before the rack mount kit can be fitted. The proce-

 

dure involves fitting the support bracket to the PM. The PM can then be loaded

 

and secured in the rack position desired.

ML2430A OM

2-3

 

 

Page 15
Image 15
Anritsu ML2430A operation manual Installation, Environmental Requirements, Rack Mounting