INSTALLATION

STORAGE AND SHIPMENT

2-8STORAGE AND

The following paragraphs describe preparing the power meter for storage and

SHIPMENT

shipment.

Preparation for

Preparing the power meter for storage consists of cleaning the unit and packing it

Storage

with moisture-absorbing desiccant crystals. Whenever the unit is to be stored for

 

an extended period (longer than one week), it is advisable to remove the optional

 

battery pack. Refer to Section 2-7, “Battery Charging, Removal and Replace-

 

ment,” for instructions.

Environmental

Store the unit in a temperature controlled environment that is maintained be-

Requirements

tween –40 and +70° C

 

(–40 to +156° F), with a maximum humidity of 90% at 40° C (104° F), non-

 

condensing. For optimum battery life, store the battery pack at –20 to +50° C (–4

 

to +122° F) for short periods and –20 to +35° C (–4 to +95° F) for long term

 

storage.

Preparation for

To provide maximum protection against damage in transit, the power meter

Shipment

should be repackaged in the original shipping container. If this container is no

 

longer available and the power meter is being returned to Anritsu for repair, ad-

 

vise Anritsu Customer Service Center; they will send a new shipping container

 

free of charge. In the event neither of these two options is possible, follow the

 

packaging instructions below.

Use a

Suitable

Container

Protect the Instrument

Cushion the Instrument

Seal the Container

Obtain a corrugated cardboard carton with a 275-pound test strength. This carton should have inside dimensions of no less than six inches larger than the instrument dimensions to allow for cushioning.

Wrap the instrument to protect the finish.

Cushion the instrument on all sides by tightly packing dunnage or urethane foam between the carton and the instrument. Provide at least three inches of dunnage on all sides.

Seal the carton using either shipping tape or an industrial stapler.

Address the ConIf-the instrument is being returned to Anritsu for service, mark the

tainer address of the appropriate Anritsu service center (Table 2-1), the Return Materials Authorization (RMA) number, and your return ad- dress on the carton in a prominent location.

ML2430A OM

2-11

 

 

Page 23
Image 23
Anritsu ML2430A operation manual Storage and Shipment, 8STORAGE