784CHAPTER 19: BACKING UP DEVICE CONFIGURATIONS

Figure 428 Device Backup Wizard - Scheduling

You can review or cancel a scheduled Device Backup operation from the

Scheduled Tasks dialog box which can be launched from Tools >

Scheduled Tasks.

Summary Step and Progress

Unless you have chosen to schedule the Device Backup operation for a future date, the operation begins once you have selected Finish on the Summary step.

During the Device Backup operation, the Device Backup Progress dialog box is shown to indicate the progress of the operation.

The Device Backup Progress dialog box can be minimized to the status bar of the application. If the Device Backup operation started according to a schedule, then it will appear in its minimized state.

You can cancel the Device Backup operation at any time. If you do cancel the operation then any backups that have already successfully completed will be kept.

Device Backup Events The alarm source is the IP address of the device and both the alarm severity and the alarm message indicate whether the attempt to back up the device was successful. The detail of the alarm message for a

Page 788
Image 788
HP Network Direr Software Products manual Scheduled Tasks, Summary Step and Progress