Mitsubishi Electronics MR-J2S- CL specifications 3Timing charts

Models: MR-J2S- CL

1 337
Download 337 pages 389 b
Page 79
Image 79
(3)Timing charts

3. SIGNALS AND WIRING

(3)Timing charts

(a)Servo-on (SON) command (from controller) ON/OFF

Tb (ms) after servo-on (SON) is switched off, servo lock is released and the servo motor coasts. If the electromagnetic brake is made valid in the servo lock status, the brake life may be shorter. For use in vertical lift and similar applications, therefore, set delay time (Tb) to the time which is about equal to the electromagnetic brake operation delay time and during which the load will not drop.

Coasting

Servo motor speed

0 r/min

 

(60ms)

Tb

Base circuit

ON

OFF

(80ms)Manual background

Electromagnetic Invalid(ON) Manual backgroundManual backgroundManual background brake interlock(MBR) Valid(OFF) Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

Manual background Electromagnetic brake Manual background operation delay time

Servo-on(SON) ONOFF

(b) Forced stop (EMG) ON/OFF

 

Dynamic brake

 

Dynamic brake

Servo motor speed

Electromagnetic brake

Electromagnetic brake

 

Electromagnetic brake release

(10ms)Manual backgroundManual background

ON Base circuit

OFF

Electromagnetic

Invalid (ON)

Electromagnetic brake

brake interlock (MBR)

Valid (OFF)

operation delay time

 

Forced stop (EMG)

Invalid (ON)

 

Valid (OFF)

 

 

 

(180ms)

(180ms)

3 - 32

Page 79
Image 79
Mitsubishi Electronics MR-J2S- CL specifications 3Timing charts