Note- In the case of a d ual power feed, connect the power cords in their original positions by
referringto th ere cord that you made before the start of maintenance.
XSCF> testsb -a
8.7.3 System-stopped maintenance1. Connect all the power cords to the PSU backplane unit of the chassis
requiringmaintenance.
For details, see "6.5.1 Installing the power cord."
2. Startthe system.
For details, see "6.4.1 Starting the system with an XSCF command"or"6.4.2
Starting the system from the operation panel."
3.
Execute the testsb command to confirm that the memory requiring maintenance
isrecognized.
4. Closethe rack door.
FujitsuM10-4/Fujitsu M10-4S/SPARC M10-4/SPARC M10-4S Service Manual ・December 2013178